SunCoke Energy FGD
- Project Location: Illinois
- Project Type: Industrial FGD
- Total Contracts: $12.8M
- Project Description:
SunCoke Energy furnishes high quality metallurgical coke to integrated steel makers that utilize blast furnace technology. Bowen was awarded the contract to install pollution controls at SunCoke's Granite City, Illinois coking plant. The Bowen team was responsible for the receiving, handling, modularization, and erection of an FGD system on site.
The project was completed in eight months. Over 121,000 man hours were worked with zero injuries.
Project Scope- 403 tons - Structural Steel
- Six Stage Bag Houses
- Spray Dry Absorber
- 3 - I.D. Fans
- Pac Silo
- Lime Silo
- Fan Inlet and Outlet Ductwork
- SDA Inlet and Outlet Ductwork
Welding Requirements- Inlet and Outlet Ductwork - 15,000 lf
- Bag House Structure - 14,000 lf
- SDA Barrel - 4,700 lf
- Seal Welding - 4,200 lf