Overview

Construction of portions of White River Tunnel System Project, including two diversion structures, screen and gate structure and a consolidation sewer.

Project Challenges:

  • The project took place in an urban setting alongside several businesses
    and residences.
  • The complex underground work required a complex dewatering plan,
    with multiple wells.
  • Project work involved working under live, high voltage lines.
    The project had an aggressive schedule, without significant float.

Bowen Resourceful:

  • Bowen elected to use precast tops on the diversion structures to mitigate working over live flowing sewers, ensuring the safety of the project.

Bowen Responsive:

  • Bowen worked proactively with residents and local businesses adjacent to the site to share plans, and ensure minimal interruption to their lives.
  • Bowen helped to identify and protect multiple unmarked existing utilities.

Bowen Results:

  • There were Zero Injuries on the project.
  • Project is slated for on time delivery.

Project Scope

  • Site work
  • Civil / concrete work
  • Underground piping
  • Mechanical/Piping
  • Architectural/Finishing Work
  • Zero Injury
  • Included Critical Lifts

Project Specs

1,500 LF 72” Hobas pipe at an average depth of 30’
50 LF of 96” Hobas Pipe
2 New Flow Diversion Structures
New Screen and Gate Structure

  • Project Location : Miley Avenue Sewer / Indianapolis, IN
  • Project Type : Construction on White River Tunnel System
  • Client : CEG
  • Total Contracts : $8,800,000
  • Project's Link : Project 1-Pager