Overview
Bowen, teaming with Butler Fairman & Suefert, and Williams Creek Consulting completed GSC Separation, Water and Sewer Updates. Project work occurred through 5 separate contracts and phases, and will divert over 100M gallons of stormwater annually from the Lafayette WWTP. In addition the project includes an educational and green storm park that captures, infiltrates and conveys stormwater. Scope:
  • Storm Sewer Separation
  • Sewer Lining
  • Water Main Relocation
  • Roadway Reconstruction
  • Storm Park / Rain Garden
"...These projects were completed on schedule and under budget. Some of these schedules have been very demanding and Bowen has always risen to the occasion. The City appreciates Bowen’s team relationship as we have been able to creatively Value Engineer project savings and use the funds to do additional much-needed work. Bowen operational staff has been extremely responsive to the needs of the City and have even helped out in emergency situations. In summary, the City of Lafayette is very pleased with the work performed by Bowen Engineering and the team environment of the Guaranteed Savings Contract process. Bowen should be proud of its staff for the excellent efforts in always getting the job done."  - Brad Talley, Superintendent, City of Lafayette WPCD  
  • Project Location : Lafayette, IN
  • Project Type : GSC CSO Separation
  • Client : City of Lafayette
  • Total Contracts : $37,000,000
  • Project's Link : Project 1-Pager

Related Projects