Overview

The City of Crawfordsville selected Bowen and BF&S to complete two GSC
projects. At the WWTP, Bowen replaced the existing clarifiers to increase capacity
and effluent water quality. Bowen also completed an underground project to
separate stormwater from wastewater for the City.

Project Challenges:

• The work was performed in a very tight space. The workable area was
constricted by existing utilities and structures that had to remain in operation
during construction.
• Bowen had several bypass operations to keep the plant operating during
construction.
• The undergound line team faced constant challenges with existing utilities
and traffic.

Bowen Resourceful:

• Bowen was able to value engineer much of the project to save the Owner
cost and apply the savings to additional upgrades.

Bowen Responsive:

• Bowen was able to adjust to the ever changing site conditions and
engineering requirements.

Bowen Results:

• Bowen saved just under $1M for the City of Crawfordsville, which was used to
purchase additional upgrades.

Project Scope

• Site Work
• Civil/Concrete Work
• Underground Piping
• Pre-Engineered Building(s)
• Equipment Setting
• Circular Clarifiers
• Submersible Pumps
• Mechanical/Piping

Project Specs

• 5,300 CY concrete
• 20,000 CY excavation backfill
• 50,000 SF formwork
• 210 tons rebar
• 6,500 LF of piping (4” - 48”)
• 5 Buildings
• Zero Injury, Zero Incident
• On Time Project Completion
• Outage Work

  • Project Location : Crawfordsville, IN
  • Project Type : Replacement of Existing Water Clarifiers
  • Client : City of Crawfordsville
  • Total Contracts : $13,407,000
  • Project's Link : Project 1-Pager