Bowen assisted the Edwardsport team on multiple scopes throughout the plant including a new sludge dewatering pad, RO water pump, NaOCl pipe and tank, trench drain, and coal dewatering building foundations.

In a design-build project with Project Associates, the team was flexible to changing designs to support a tough schedule

Project Challenges:

  • Much of this foundation-heavy project was completed in a cold late December, making it a challenging time to place concrete.
  • The owner, to support budgeting schedules asked that the team complete the work before the end fo the calendar year.

Bowen Resourceful:

  • Bowen worked with the owner to use a laser screed and a employed an alternative approach to concrete finishing saving the owner schedule and budget.

Bowen Responsive:

  • After finishing initial project scope, Bowen succesfully supported the client’s December 1st request to have a slab pour completed before Christmas. Bowen quickly developed and executed the plan for an ontime completion.

Bowen Results:

  • Bowen delievered the project before Christmas with Zero Injuries

Project Scope

  • Site Work
  • Civil/Concrete
  • Underground Piping
  • Pre-Engineered Building(s)
  • Equipment Setting
  • Mechanical Piping
  • Stainless
  • PVC
  • HDPE

Project Specs

  • 700 CY of excavation backfill
  • 1,400 CY of concrete
  • 8,600 SF of formwork
  • 200 anchor bolts
  • 150 LF of piping ranging from 1/4” diameter to 12” diameter
  • 2 structures
  • 24,000 SF of buildings
  • Fiberglass Tank
  • 4 pumps
  • Zero Injuries
  • Design Build

 

  • Project Location : Edwordsport, IN
  • Project Type : Site Work Throughout the Plant
  • Client : Edwordsport
  • Total Contracts : $1,800,000
  • Project's Link : Project 1-Pager