Overview

To help IPLs Petersburg facility achieve compliance with the EPA’s Coal Combustion Residual (CCR) rules, Bowen is building a Bottom Ash System.

Bowen’s scope includes 3 4 UCC Model 1530 conveyor systems and tie-in to the boiler. Bowen is self-performing all site work, underground utilities, civil, structural steel, mechanical piping, equipment erection, pre-engineered buildings for this project.

Tie-ins will occur during 3 future unit outages.

In addition to the Bottom Ash scope of the project, Bowen is also currently assisting IPL Petersburg with a Physical-Chemical and ZLD Wastewater system.

Project Scope

  • Site work
  • Civil/concrete work
  • Underground utilities
  • Structural steel
  • Equipment Setting
  • Mechanical
  • Electrical

Project Specs

  • 175,000 Craft Hours
  • Zero Injuries
  • 5,200 CY of concrete
  • 3 UCC Submerged Flight Conveyors
  • 17 pumps
  • 261’ X 115’ Building
  • 200 tons of structural steel
  • 5,200 CY of concrete
  • 5,636 LF of welding
  • 22,000 LF of exposed piping
  • Outage Work
  • Project Location : Petersburg, IN
  • Project Type : Building a Bottom Ash System
  • Client : IPL Petersburg
  • Total Contracts : $50,000,000
  • Project's Link : Project 1-Pager