Recent Projects

City of Muncie GSC CSO

Bowen, teaming with United Consulting used a collaborative approach to bring this project in under budget and under ...

NRG Sayreville SCR

Bowen teamed with WorleyParsons for the EPC delivery of an SCR system at NRG’s Sayreville, NJ facility. The system u ...

NIPSCO Railcar Dumper

In support of a replacement of a New Railcar Dumper at the NIPSCO Michigan City Generating Station, Bowen constructe ...

Alcoa Warrick FGD

In 2005, Alcoa invested approximately $330M for improvements to its Warrick Power Plant located in Newburgh, Indiana ...

SunCoke Energy FGD

In December of 2008, Bowen Engineering was awarded construction of a $12.8 million FGD package at SunCokeʼs Granite ...

TVA Kingston FGD

Project Summary: The TVA Kingston Fossil Plant is located 35 miles west of Knoxville, Tennessee. The installation of ...

Duke Energy Edwardsport IGCC

Project Summary: In September of 2008, Duke Energy began the landmark project of building the cleanest coal fired po ...

West Lafayette WWTP

Project Summary: In November of 2007, Bowen Engineering began work for the City of West Lafayette on Digester Renova ...

AEP Muskingum River FGD

Project Summary: American Electric Power’s Muskingum River Plant, located in Waterford, OH, is one of the sixteen co ...

TVA Kingston Dry Fly Ash

Project Summary: As the result of a resolution that was passed by the TVA Board of Directors in 2009, TVA re-viewed ...

US Steel Precipitator Rebuild

Project Summary: In September of 2008, Bowen was awarded an alliance contract with US Steel to rebuild a failing pre ...

Bargersville WTP No. 2

Project Summary: The Bargersville project began in July of 2011, and has an anticipated completion date of September ...

US Steel Primary Quench Tower

Project Summary: The US Steel Granite City Ironworks project involved the replacement of the existing coke quenching ...

IP&L – Petersburg

Project Summary: Bowen Engineering was contracted by Indianapolis Power & Light (IP&L) to perform the site/ ...

White River WTP

Project Summary: Black & Veatch provided design and construction support for an Ultraviolet (UV) Disinfection pr ...

TVA Paradise FGD

Project Summary: The Tennessee Valley Authorityʼs Paradise FGD Project was Bowenʼs first opportunity to work on a co ...

Indianapolis North Flood Wall

Project Summary: From 1950 – 2002, there have been four critical floods in Indianapolis, Indiana. In January 1991, f ...

AEP Kyger Creek FGD

Project Summary: In November of 2007 Bowen began work on the overland conveyor project at American Electric Power’s ...

IP&L Harding Street FGD

Project Summary: Having enjoyed a successful partnership with Bowen in the construction of three FGD projects for th ...

Geist Water Treatment Plant

Project Summary: The Geist Water Treatment Plant project includes three individual projects at the same site for Veo ...

AEP Cardinal FGD

Project Summary: Bowen Engineering constructed the FGD retrofit project at American Electric Power’s Cardinal Plant ...

TVA Bull Run FGD

The Bull Run Fossil Plant is located on Bull Run Creek near Oak Ridge, Tennessee. It is the only single-generator co ...

Buchanan Mine WTP

Project Summary: The Buchanan MIne water treatment plant is owned by CONSOL Energy and is located in the mountain te ...

Brandon Shores WWTP

Project Summary: Bowen Engineering was partnered with Siemens Water Technologies and contracted by Constellation Pow ...

Duke Energy Gibson FGD

Project Summary:  Bowen Engineering performed all site-civil construction for the Duke Energy (formerly Cinergy) Gib ...

Lafayette WWTP Expansion

Project Summary: Bowen Engineering Corporation was the successful bidder on this $55.7 million project, one of the l ...

Meadow Lake Wind Farm

Project Summary: Bowen served as Balance of Plant Contractor for the 200 MW Meadow Lake Wind Farm project in White C ...

TVA Kingston Fossil Plant

Project Summary: The TVA Kingston Fossil Plant is located 35 miles west of Knoxville, Tennessee. The installation of ...

AEP Clifty Creek FGD

Project Summary: Bowen performed site-civil construction and the erection of the facility superstructure. The 8,400 ...